The Labason-Liloy and Labason-Gutalac boundaries are linked by the National Highway, which is approximately 41 kilometers in length.  Provincial roads that connect barangays to the National Highway and to the Poblacion measured at around 45 kilometers; Barangay Roads, which are mostly underdeveloped, totaled to 86 kilometers; while existing roads that divide the poblacion into blocks are estimated at around 13.340 kilometers excluding the 9.550 kilometers proposed roads.